Without a secure foundation, it is impossible to transfer the loads resulting from the operation of wind turbines. This is why the foundations are made of concrete and steel. After the steel structure has been installed and approved from a structural point of view, we install between 650 and 850 cubic meters of concrete per wind farm turbine as a daily output and carry out the concrete curing.